Skip to content

VAAGEN BROS. UPGRADING COLVILLE MILL

Vaagen Bros. is installing a Multi-Track Fence and VerifEye fence verification system at its Colville, Wa., mill

Table of Contents

 Vaagen Brothers Lumber, Colville, Wa., is improving final board position and trim accuracy thanks to a combination of USNR's Multi-Track Fence and VerifEye fence verification system.

In a fast-paced mill, there’s no room for error. These upgrades to the Vaagen Brothers system aim to drastically reduce the amount of starting and stopping, as well as improve the overall product.

The Multi-Track Fence offers a unique approach specifically for Vaagen Brothers, acting as a “pusher-style” system. This utilizes the Fence Paddle to transfer lumber in the opposing offset.

Once the Multi-Track Fence accurately lines up the board, it’s sent to the VerifEye system to measure the board ends and compare their position accuracy with the optimizer’s solution, verifying the board’s end location is within error tolerance. The key to accuracy is in the laser array the VerifEye system uses, as opposed to a single point. It provides a better 3D image regardless of defects or sniped ends and produces a histogram along with the standard deviation and means for all trend data.

Latest

CLEAR ACRYLIC FLASHING

CLEAR ACRYLIC FLASHING

TYPAR has developed the industry’s first Clear Acrylic Flashing in response to evolving builders’ needs and emerging building code changes requiring better visibility of the nail and screw fin patterns on windows during window installations and inspections.